Get new stores trading on time, every time

36% of retailers delay store openings due to managed network setup. We deliver Day 1 connectivity with LTE/5G interim links, blueprint-led installs, and pre-tested segmentation so tills, pumps and Wi-Fi go live when doors open.

globe-icon-white 10,000+ sites / 12 countries
shield-32x32 Independently audited security controls
tick-badge-icon-white UK-based, 24/7/365 monitoring

Trusted by multi‑site brands across Retail, Hospitality, QSR and Forecourts.

  • sunbelt-rentals-logo-white
  • asda-logo-white
  • cumberland-farms-logo-white
  • ascona-group-logo-white
  • eg-on-the-move-logo-white
  • home-bargains-logo-white
  • pret-a-manager-logo-white
  • enerveo-logo-white
  • ellis-williams-architects-logo-white
  • sheddon-construction-logo-white

Why new store openings stall and how to de-risk launch day

Fixed-line lead times stretch 8–16 weeks. Kit arrives late or misconfigured. POS, CCTV and guest Wi-Fi compete for bandwidth on a single path. One delay cascades into lost revenue, reputational risk and pressure on site teams. We eliminate the single points of failure.

  • screen-exclamation-mark-icon-green

    Long carrier lead times with no interim solution

  • person-x-sign-falling-icon-green

    Single-path connectivity; no tested failover

  • wifi-connected-icon-green

    POS and guest Wi-Fi on the same flat network

  • three-stars-icon-green

    Late kit delivery or wrong configurations

Every delayed opening costs revenue and damages reputation

36

%

Retailers delay openings

Due to inability to establish managed networks in time

650

k+

Wayleave agreements

Pre-negotiated infrastructure access speeds deployment

Day 

1

Trading protection

LTE/5G keeps tills live while fixed lines provision

Launch-ready connectivity delivered before doors open

We protect Day 1 trading with interim links, then transition to Dual-WAN with segmentation and 24/7/365 monitoring once fixed lines are live.

power-on-icon-green-box

Day 1 LTE/5G connectivity

Interim links keep POS, kiosks and guest Wi-Fi live from opening day while fixed circuits provision. No trading delay.

loop-green-box

Blueprint-led deployment

Pre-staged kit, tested configs and scripted cutover windows ensure repeatable, on-time rollouts across your estate.

sd-wan-green-box

Dual-WAN with segmentation

Once fixed lines arrive, automatic transition to carrier-diverse Dual-WAN with POS, CCTV and guest traffic isolated.

globe-green-box

24/7/365 UK-based NOC

Proactive monitoring from day one, with P1 response in minutes and carrier coordination if issues arise.

Prove it fast, scale it safely

  • Plan

    Site survey and timeline lock

    We survey access options, carrier lead times and interim requirements, then deliver a costed plan with Day 1 protection and fixed-line transition dates.

    • Access survey with carrier lead-time confirmation
    • LTE/5G interim specification per site
    • Blueprint kit list and cutover timeline
    • Clear costs and SLA commitments
  • Stage

    Kit staged and pre-configured

    Equipment arrives pre-configured and tested. On-site engineers complete physical install, verify connectivity and segmentation, then hand over to trading teams.

    • Pre-tested configurations reduce on-site time
    • LTE/5G live before doors open
    • POS, CCTV and guest Wi-Fi segmented from Day 1
    • Handover checklist signed off
  • Transition

    Seamless fixed-line cutover

    Once carrier circuits are live, we transition from interim to Dual-WAN during a planned window. Trading stays protected; segmentation and monitoring continue.

    • Out-of-hours cutover with rollback plan
    • LTE/5G remains as tertiary backup
    • Zero trading disruption
    • Estate dashboard updated in real time

Predictable openings, protected revenue

Open on schedule with confidence. Day 1 interim connectivity eliminates carrier-delay risk. Blueprint-led deployment scales repeatable quality across your estate, and 24/7/365 monitoring keeps every site online from launch.

person-paying-at-till

Learn from businesses like yours

eg-group-logo Read More

Powering EG Group's global network: Simplified management across 10 countries

Powering EG Group's global network: Simplified management across 10 countries

6,000+

sites across 10 countries

Read More

Direct data centre integrations for secure multi-site connectivity

Direct data centre integrations for secure multi-site connectivity

250+

Global payment hosts

Read More

Enhancing the museum experience: Guest Wi-Fi for 3 million annual visitors

Enhancing the museum experience: Guest Wi-Fi for 3 million annual visitors

7

venues connected with guest Wi-Fi infrastructure.

Frequently asked questions

Open your next store on time with zero network delay

Get Day 1 connectivity with LTE/5G interim, blueprint-led deployment, and 24/7/365 monitoring. No carrier delays, no trading disruption.